Official Site of the U.S. Air Force   Right Corner Banner
Join the Air Force

News > Deployed Airmen choreograph vital F-16 maintenance
 
Photos
Previous ImageNext Image
Doin' the dance
Airman 1st Class Cameron Carder (left) and Airman 1st Class Christina Thilges, electricians assigned to the 451st Expeditionary Aircraft Maintenance Squadron at Kandahar Airfield (KAF), Afghanistan, run a battery of tests on the electrical systems of a South Carolina Air National Guard F-16 on June 26, 2012. (U.S. Air Force photo/TSgt. Stephen Hudson)
Download HiRes
Deployed Airmen choreograph vital F-16 maintenance

Posted 7/10/2012 Email story   Print story

    


by Tech. Sgt. Stephen Hudson
451st Air Expeditionary Wing Public Affairs


7/10/2012 - KANDAHAR AIRFIELD, Afghanistan (AFNS) -- After 400 flight hours, the F-16s of the 157th Expeditionary Fighter Squadron are due for a thorough inspection - and the Airmen working in the phase dock here are the ones keeping the jets in the fight.

When an F-16 is towed off the line and into the hangar, the choreographed dance of maintenance personnel moving in and around the aircraft is well scripted. The men and women of the 451st Expeditionary Maintenance Squadron break the jet down from top to bottom and meticulously go over it.

"It looks chaotic, but everyone has their own piece of the pie," said Master Sgt. Shannon Mines with the 451st Expeditionary Maintenance Squadron.

If the sequence of events surrounding a phase inspection is an orchestra, then Mines is the conductor. As the dock supervisor Mines, who is on his 10th deployment for the Air Force, is responsible for the activities that go on during a phase inspection.

"A lot of maintenance is getting done here," Mines said.

In a matter of weeks these F-16s are putting on hours that would take months to accumulate back home at McEntire Joint National Guard Base. While a phase inspection can take up to three weeks at home, here it is compressed into three-and-a-half-days.

Since a phase inspection is done every 400 hours, the crews working on the jets are tackling scheduled and unscheduled maintenance, meaning a jet that leaves phase is good for another 30 days. Since April, this is the 15th jet to come through the phase docks. In May phase dock set a Kandahar Airfield record by completing inspections on eight aircraft.

"It has to be 100 percent," Mines said of the heavy and intense maintenance. "A pilot doesn't have to worry if his landing gear is going to work."

As of June 30, the F-16s from the 157th Expeditionary Fighter Squadron have flown around 1,200 sorties totaling more than 5,000 hours.

"It's a huge team effort," said Mines. "Every shop in maintenance has a hand in it, and I am very proud of this group of guys."



tabComments
No comments yet.  
Add a comment

 Inside AF.mil

ima cornerSearch

tabSubscribe AF.MIL
tabMore HeadlinesRSS feed 
All I want for Christmas ... Daddy!

Osan community brightens holidays for Korean orphans  |  VIDEO

Deployed Airman receives Christmas phone call from President Obama

Air Force Week in Photos

Premier AF concert band 'wows' fellow musicians at Midwest Clinic  3

Rescue, battlefield Airmen train as one  4

Through Airmen's Eyes: High school reunion ... above Afghanistan

Space Fence program moves forward

Kunsan AB, Hurlburt Field Airmen unite to spread holiday cheer

Operation Christmas Drop  1

Air Force Week in Photos

Panetta memo describes possible sequestration effects  1

Academy firefighters recognized for Waldo Canyon Fire efforts

154 selected for captain

tabCommentaryRSS feed 
Legacy of valor

There IS an I in team  3


Site Map      Contact Us     Questions     Security and Privacy notice     E-publishing