Official Site of the U.S. Air Force   Right Corner Banner
Join the Air Force

News > ESC working to upgrade the 'heart' of control, reporting center
 
Photos 
Deployed Control and Reporting Center
An Electronic Systems Center team is updating a key component of the Control and Reporting Center, shown here at a deployed location. The team is working to upgrade the CRC Operations Module and recently put out a request for information. (Courtesy photo)
Download HiRes
ESC working to upgrade the 'heart' of control, reporting center

Posted 1/30/2012 Email story   Print story

    


by Patty Welsh
66th Air Base Group Public Affairs


1/30/2012 - HANSCOM AIR FORCE BASE, Mass. (AFNS) -- The Electronic Systems Center is working to modernize the U.S. Air Force Control and Reporting Center and has recently put out a request for information to upgrade the CRC Operations Module.

The CRC is a mobile command, control and communications radar element which provides a comprehensive air picture by integrating input from air- and ground-based radars.

"By using the CRC, warfighters -- in the sky and on the ground -- are more easily able to conduct an air/land battle," said Robert Grudziecki, the CRC deputy program manager. "By connecting to the other fine surveillance tools we have today, such as Joint (Surveillance Target Attack Radar System) and (Airborne Warning and Control System), they are able to have a complete air picture in near real time."

The CRC consists of several subsystems, including AN/TPS-75 radar, a radio module, theater deployable communications unit module and the operations module. According to program officials, the operations module is considered the "heart" of the CRC as it displays the information obtained from various sensors.

The request for information is for an effort called the "C2 Engine Upgrade." The idea is to have the operations module consist of a sustainable, off-the-shelf, open architecture technical configuration that not only upgrades the system but reduces the overall logistical footprint to the maximum degree possible.

There are six main areas that are being looked at as part of the effort: battle management, weapons control, surveillance, combat identification, airspace management and tactical data link management.

Any upgrades also need to ensure they can integrate new and emerging technologies when they become available and allow for net-centric operations.

"The CRC sees thousands of tracks every day," Grudziecki said. "Although it has been very successful, we can't have any sort of antiquated equipment. We need to enhance the equipment -- computers, software, radios -- to ensure it is available when our warfighters need it most."

Although the CRC is considered very rugged and reliable, when the program began, it would take multiple aircraft to transport the CRC to its destination. Now, in its fourth generation, it is air- and road- transportable. However, the program office is still looking to improve its mobility.

"Currently, the CRC has 16 operator stations in four separate operations modules," said Rod Rendina, the program manager. "We are looking, with our partner at the Ogden Air Logistics Center (at) Hill Air Force Base, Utah, to see if all four are still needed and if there's a way we can put the stations themselves directly into the deployed environment."

The request for information and information about industry days are available on FedBizOpps at https://www.fbo.gov.

"These are exciting times," Grudziecki said. "As we look at modernizing the CRC, we are looking to industry to see what solutions can enhance it -- what parts and pieces might already exist that can enhance its mission."

The CRC program office is looking at some future endeavors as well. One of the capabilities they are looking at is a ground moving target indication capability to receive, process and display ground and air tracks.



tabComments
2/5/2012 2:32:44 PM ET
Its sad when you think about it. Really ... the procurement folks keep dropping the ball. Look at Battle Control Mobile. Where did that go Nowhere is where it went because of continuous mission creep unwieldy requirements and a loss of focus. How much did we spend on that
Capt ScopeDope, Eglin AFB FL
 
2/5/2012 11:28:01 AM ET
Its really too bad that the requirements folks could not have worked better with ESC on the formerly flubbed BCS-M system. The OMs are antiques and more technology lipstick won't make an obsolete system much better. Need to start from scratch
GTACS Troop, LAFB VA
 
2/3/2012 6:34:16 PM ET
Well would would hope success this time. Especialy after what did not happen with Battle Control System-Mobile.
SMSgt JDOT, Langley AFB
 
Add a comment

 Inside AF.mil

ima cornerSearch

tabSubscribe AF.MIL
tabMore HeadlinesRSS feed 
Acting SecAF recounts journey to equality  6

Civil engineers recall, reflect 17 years after Khobar Towers bombing  1

Air Force selects 5,654 for technical sergeant  1

Aerial firefighting continues against Rocky Mountain fires

Through Airmen's Eyes: One Airman's journey to a brighter future  5

Air Force Medical Service website focuses on Men's Health Month

More military aircraft join fight against wildland fires

Fanning becomes acting Air Force secretary

Through Airmen's Eyes: Love, service, sacrifice define Airman's career  9

Donley: It has been an honor to serve with you in the world's finest Air Force  3  |  VIDEO

SEAC to Airmen: Embrace innovation, Total Force Fitness as military leans down  4

AF seeks scholarship, fellowship candidates  3

Reserve C-130s respond to Colorado fire  1

Air Force deputy undersecretary addresses aviation industry in Paris

tabCommentaryRSS feed 
Our commitment, our community

'Lucky' people take personal responsibility for their own success  11


Site Map      Contact Us     Questions     USA.gov     Security and Privacy notice     E-publishing  
Suicide Prevention      Sexual Assault Awareness & Prevention     FOIA     IG   EEO