Official Site of the U.S. Air Force   Right Corner Banner
Join the Air Force

News > C-130J testers accomplish first five-bundle sequential airdrop
 
Photos
Previous ImageNext Image
C-130J testers accomplish first five-bundle sequential airdrop
EDWARDS AIR FORCE BASE, Calif. -- A J-model C-130 Hercules flies over a range here recently, successfully completing the first five-bundle sequential low velocity airdrop. The bundles weighed 40,100 pounds and landed 1,000 feet apart and only five yards off the planned impact point. (U.S. Air Force photo by Chad Bellay)
Download HiRes
C-130J testers accomplish first five-bundle sequential airdrop

Posted 4/22/2005 Email story   Print story

    


by 1st Lt. Brooke Davis
Air Force Flight Test Center Public Affairs


4/22/2005 - EDWARDS AIR FORCE BASE, Calif. (AFPN) -- Developmental test and evaluation on the J-model C-130 Hercules came to a head when testers successfully completed the first five-bundle sequential low velocity airdrop here recently.

As part of the test program, 418th Flight Test Squadron Airmen tested software upgrades by rigging five bundles aboard the stretch aircraft and releasing them on a range area.

The bundles weighed 40,100 pounds and landed 1,000 feet apart and only five yards off the planned impact point.

Before this test, the capability was limited to four bundles, said Tech. Sgt. Jason Kunkel, a 418th FLTS loadmaster.

"Right now, we're doing everything we need to do before the aircraft graduates to operational testing," he said. "By working closely with the contractor, we were able to identify and fix deficiencies to ensure the Air Force received a workable system."

Airmen spent the summer working with the contractor to make sure the software upgrades corrected the aircraft's operational limitations, Sergeant Kunkel said. The software upgrades enhanced the cargo-handling system, as well as advancing the communication, navigation and identification systems.

Testers are evaluating how the upgrades affect other systems, officials said.

"The EPJS is a safety system that keeps the loadmaster from having to go behind the load if it doesn't extract from the aircraft," Sergeant Kunkel said. "If a load doesn't extract, the largest parachutes can produce 50,000 pounds of drag for the aircraft."

The system was successfully evaluated April 19 under an extraction load of single 28-foot parachute bundles, and the system worked well, Sergeant Kunkel said.

Overall, the J-model aircraft increases cargo delivery to the warfighter, decreases aircrew needs and has an increased sortie reliability rate, Sergeant Kunkel said. Deployed units will be able to accomplish in one day what older models can accomplish in two.

The test program is scheduled to graduate to operational test and evaluation at Little Rock Air Force Base, Ark., in October.



tabComments
No comments yet.  
Add a comment

 Inside AF.mil

ima cornerSearch

tabSubscribe AF.MIL
tabMore HeadlinesRSS feed 
F-35 ITF works toward night, weather certification

Commissaries plan for Mondays furlough  1

AF leaders remind force to be safe this summer  1

DOD firefighter certification program turns 20  1

Director details furlough plans for DOD schools

New under secretary visits Joint Base San Antonio

Hagel emphasizes summer safety in message to Department

Air Force leaders send Memorial Day message  2

KC-46A training, operational bases, alternatives selected  8

AF 7 Summits team scales Everest

Tinker AFB aircraft return to Oklahoma after diverting to Arizona   1

U.S. NORTHCOM aids Oklahoma tornado disaster relief efforts

First enlisted Airmen graduate from new Weapons School course

Hannah Dake wins Arthur Ashe Leadership and Sportsmanship award

tabCommentaryRSS feed 
Ordering monkey food  3

Only fools sit around wishing for good old days  23


Site Map      Contact Us     Questions     USA.gov     Security and Privacy notice     E-publishing  
Suicide Prevention      Sexual Assault Awareness & Prevention     FOIA     IG   EEO