Massachusetts Military Reservation wind turbines
Under secretary of the Air Force Erin Conaton speaks at a ribbon cutting ceremony for two new Air Force wind turbines Oct. 28, 2011, at the Massachusetts Military Reservation in Cape Cod, Mass. The 1.5 megawatt wind turbines, in addition to an existing turbine, were built to offset electrical costs for powering numerous groundwater cleanup systems at the reservation. The turbines will pay for all the Air Force's electric needs for groundwater remediation at MMR, saving more than $1.5 million per year. They will also offset emissions generated by fossil-fueled power plants, reducing the Air Force's carbon footprint. (U.S. Air Force photo/Scott Dehainaut)
PHOTO BY:
VIRIN:
111001-F-PJ779-001.JPG
FULL SIZE:
2.66 MB
CAMERA
N/A
LENS
N/A
APERTURE
N/A
No camera details available.
IMAGE IS PUBLIC DOMAIN
Read More
This photograph is considered public domain and has been cleared for release.
If you would like to republish please give the photographer appropriate credit.
Further, any commercial or non-commercial use of this photograph or any other
DoD image must be made in compliance with guidance found at
https://www.dimoc.mil/resources/limitations,
which pertains to intellectual property restrictions (e.g., copyright and
trademark, including the use of official emblems, insignia, names and slogans), warnings
regarding use of images of identifiable personnel, appearance of endorsement, and related matters.