HomeNewsPhotos

Air Force Photos

151215-F-RI777-009
B-1B functional check flight pilot Maj. Michael Griffin, with the 10th Flight Test Squadron, Tinker Air Force Base, Okla., evaluates critical defensive and offensive aircraft systems, such as upgraded navigation procedures, radar systems and aircraft terrain, Dec. 15, 2015. An eight-year project to install the Integrated Battle Station on the B-1B Lancer fleet, which began in 2012, was completed in September 2020. (U.S. Air Force photo by Kelly White)

Download Image: Full Size (1.56 MB)
Tags:
Photo by: Kelly White |  VIRIN: 151215-F-RI777-009.JPG