Planes over water

AIR FORCE PHOTOS

Construction workers create a path for electrical cables that will connect to the first electric aircraft charging station on a military installation at Duke Field, Fla., Sept. 19, 2023. The expected completion date for the Level 3 direct current electric vehicle fast charging station construction project is Oct. 13, 2023, weeks before BETA’s electric vertical takeoff and landing aircraft arrives for testing. (U.S. Air Force photo by Samuel King Jr.)

PHOTO BY: Samuel King Jr.
VIRIN: 230919-F-OC707-0001.JPG
FULL SIZE: 1.68 MB
Additional Details

CAMERA

NIKON D850

LENS

16.0 mm f/2.8

APERTURE

63/10

SHUTTERSPEED

1/800

ISO

100

IMAGE IS PUBLIC DOMAIN

Read More

This photograph is considered public domain and has been cleared for release. If you would like to republish please give the photographer appropriate credit. Further, any commercial or non-commercial use of this photograph or any other DoD image must be made in compliance with guidance found at https://www.dimoc.mil/resources/limitations, which pertains to intellectual property restrictions (e.g., copyright and trademark, including the use of official emblems, insignia, names and slogans), warnings regarding use of images of identifiable personnel, appearance of endorsement, and related matters.