NATO Air Policing operations

U.S. Air Force News

  • AF engineers log record-breaking accelerated engine test

    A highly successful accelerated mission test (AMT) of Pratt & Whitney's F135 conventional take-off and landing/carrier variant (CTOL/CV) engine was recently completed in the Sea Level 3 test cell (SL-3) at the Arnold Engineering Development Center.

  • Air Force completes historic fuel conversion

    The Air Force took an important step in fiscal responsibility and supply chain efficiency as it converted its final stateside installation from Jet Propellant 8 (JP-8) fuel to the more common and commercially available Jet A fuel, Oct. 29 at Wright Patterson Air Force Base, Ohio.

  • Under pressure: Crew chiefs take mission in stride

    Tools clang and the clock ticks as time narrows, several pairs of grease-stained boots can be seen darting back and forth beneath a lifeless fighter jet as Airmen work relentlessly to repair their bird for flight.

  • Hill AFB in midst of robust F-35 preparation

    Hill AFB’s preparations for the F-35A Lightning II, totaling more than $100 million, with 23 projects to be completed between September 2014 and July 2015, and 36 total projects will be finished once construction concludes in 2019.

  • Tyndall AFB takes F-22 pilot training to next level

    The Air Force’s ability to continue developing a fifth generation fighter aircraft fleet ready to meet the challenges of future warfare, hinges in large part, on a steady influx of capable and trained F-22 Raptor pilots.

  • Final B-52G eliminated under New START

    One rescue saw, two qualified technicians and less than 45 minutes later, the final B-52G Stratofortress accountable under the New START Treaty was eliminated Dec. 19 at the 309th Aerospace Maintenance and Regeneration Group, commonly referred to as "The Boneyard," Davis-Monthan Air Force Base,

  • Aero repair keeps ‘birds’ in the air

    With the highest volume of flying missions in the U.S. Air Forces Central Command area of responsibility, aircraft at the 379th Air Expeditionary Wing rely on a team of professional maintainers to keep them in top shape to accomplish the air tasking order.